7799国产精品久久久久99,欧美成人精品一区二三区在线观看,好紧好湿好滑好爽好大,国产嘿嘿嘿视频在线观看

  熱門關鍵詞:
CQI一12一2011一3一24
  • 該文件為zip格式
  • 文件大小:44.39K
  • 下載次數
  • 文件評級
  • 更新時間:2013-04-20
  • 發(fā) 布 人53368260
  • 文件下載:
  • 立即下載

  • 文件介紹:
  • 該文件為 zip 格式,下載需要 1 積分
  • CQI-12-2011-3-24"All requirements given below are subordinate to customer specific requirements.

    The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify coater is conforming to customer requirements."

    Item # "Related
    CSA Question #" Category/Process Steps Control Monitoring
    1.0 AQUEOUS CLEANING PROCESS (Alkaline or Acid)
    A1.1 1.4 There shall be an incoming part assessment procedure with criteria. Per Control Plan Per lot
    2.0 Cleaning Bath(s)
    A2.1 2.11 The following checks shall be performed during production:
    A2.2 "1.4
    2.11
    2.12" Pressure/Agitation Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
    A2.3 "1.4
    2.11
    2.12" Temperature Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
    A2.4 "1.4
    1.6
    2.11
    2.12" Time Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
    A2.5 "1.4
    1.6
    2.11
    2.12" Chemical Concentration Automatic/Manual Per Control Plan/Log Sheet (1/shift minimum)
    A2.6 "1.4
    2.11
    2.12" Impurity Content (e.g. acid split) Manual Per Control Plan/Log Sheet (1/shift minimum)
    ...
文檔留言
驗證碼: 請在右側輸入驗證碼 看不清楚,換一個
更多..相關文檔
    無相關信息